All Products
Services
Support
About Us
Resources
Mind your business with a variety of trusted payment options.
Use order number or tracking number to check shipping status.
Get your quote fast and offer you more professional service.
Help manage your budget & expenditure better.
Free samples support, achieve your test results efficiently.
Professional team support and service, to solve your problems in time.
Ask us whatever you care, we will help you 24/7.
Get your quote fast and offer you more professional service.
Meet us and know our mission, belief, service and more.
Find our locations and get connected with us closely.
Quality management, testing, compatibility and global compliance.
Download ISO, CE, FCC, UL, RoHS and REACH certificates by product line.
Lab tour, optical test bed, compatibility tool and test requests.
Find out the latest news and events around l-p.com
Deep dive into technical guides, industry standards, and SFP compatibility insights.
Detailed product benchmarks and side-by-side comparisons to help you choose the right module.
Explore real-world connectivity solutions for data centers, enterprises, and telecom networks.
Essential tips on choosing data rates, transmission distances, and connector types.
New Customer? Create an account
| LINK-PP Part Number | LP11ACS2000S REVB | Part Status | Active |
| Connector Style | Cage | Connector Type | SFP |
| Mounting Type | Through Hole, Right Angle | Termination | Solder |
| Port Matrix Configuration | 1x1 Port | Number of Ports | 1 |
| Features | EMI Shielded | PCB Mounting Style | Through Hole - Solder |
| Included Lightpipe | No | EMI Containment Feature Type | EMI Springs |
| Height (Inches/mm) | 0.384/9.75 | Length (Inches/mm) | 1.919/48.75 |
| Width (Inches/mm) | 0.591/15.10 | Operating Temperature Range | -40 – 85°C |
Compatible | LINK-PP | LINK-PP | LINK-PP | LINK-PP | LINK-PP | LINK-PP |
Connector | Cage | Cage | Cage | Cage | Cage | Cage |
Operating Temperature | -40 – 85°C | -55 – 85°C | -55 – 85°C | -55 – 85°C | -55 – +85°C | -55 – 85°C |
Pluggable I/O Product Type | Cage | Cage | Cage | Cage | Cage | Cage |
EMI Containment Feature Type | EMI Springs | EMI Springs | EMI Springs | EMI Springs | EMI Springs | EMI Springs |
Lightpipe Options | Not Optional | Not Optional | Not Optional | Not Optional | Not Optional | Not Optional |
Termination Method to Printed Circuit Board | Through Hole - Solder | Through Hole - Press-Fit | Through Hole - Press-Fit | Through Hole - Press-Fit | Through Hole - Press-Fit | Through Hole - Press-Fit |
Part Status | Active | Active | Active | Active | Active | Active |
Connector Style | Cage | Cage | Cage | Cage | Cage | Cage |
Mounting Type | Through Hole, Right Angle | Through Hole, Right Angle | Through Hole, Right Angle | |||
Termination | Solder | Press-Fit | Press-Fit | Press-Fit | Press-Fit | Press-Fit |
Port Matrix Configuration | 1x1 Port | 1x1 Port | 1x1 Port | 1x1 Port | 1x1 Port | 1x1 Port |
Number of Ports | 1 | 1 | 1 | 1 | 1 | 1 |
Features | EMI Shielded | EMI Shielded | EMI Shielded | |||
PCB Mounting Style | Through Hole - Solder | Through Hole - Press-Fit | Through Hole, Right Angle | Through Hole - Press-Fit | Through Hole, Right Angle | Through Hole, Right Angle |
Included Lightpipe | No | No | No | No | No | No |
Height | 0.384/9.75 | 0.384/9.75 | 0.384/9.75 | 0.384/9.75 | 0.384/9.75 | 9.75/0.384 |
Length (Inches/mm) | 1.919/48.75 | 1.919/48.75 | 1.919/48.75 | 1.919/48.75 | 1.919/48.75 | 48.75/1.919 |
| Pictures | ID# | Description | Price | Stock | Add to Cart |
Q: What is the key difference between LP11ACS2000S REVB and press‑fit LP11AC02000 REVB? Can I swap them directly on my existing PCB? By J***. on 2026-03-01
A: LP11ACS2000S REVB uses solder‑tail termination; LP11AC02000 REVB uses press‑fit pins. Footprints differ. Direct drop‑in swap cannot be guaranteed without full drawing comparison. By admin on 2026-03-02
Q: Besides 5‑year warranty and 30‑day return‑exchange policy, where can I get solder‑tail drawing files for LP11ACS2000S REVB? By V***a on 2025-05-26
A: We provide 5‑year warranty plus 30‑day return‑exchange service. Datasheet PDF can be downloaded directly from product page. Contact sales if additional supporting documents are needed. By admin on 2025-05-26
Q: What are core specs for LINK‑PP LP11ACS2000S REVB? Does this 1x1 SFP cage have built‑in inner light pipe? By T***e on 2024-09-07
A: It is single‑port(1×1) SFP cage, right‑angle through‑hole solder termination,‑40℃~+85℃ operating temperature, EMI spring fingers. Integrated lightpipe is not included. By admin on 2024-09-08
{{reply_items.topic || reply_items.text}}By {{reply_items.author}}
{{ lpMoneyText(detail_data.displayed_price.unit_prefix, item.displayed_price.value || item.displayed_price.min, detail_data.displayed_price.unit_suffix) }}
Germany
Carrier
CostDelivery TimeTracking
Company
CostTime
{{ shipitem.name }}
{{ isFreeShipping(shipitem)? 'Free Shipping' : lpMoneyText(detail_data.displayed_price.unit_prefix, shipitem.price, detail_data.displayed_price.unit_suffix) }} To Be Negotiated {{shipitem.datemin}}-{{shipitem.datemax}} days Available
{{parseInt(detail_data.left_num) ? detail_data.left_num +' in Stock' :detail_data.zeroStockOrder==0?'Out of Stock':'Available'}}